FAQs

Epoxy 704

  • What is the installation process?

    For garage flooring in Charlotte, NC, the process typically includes diamond grinding the concrete to create the proper surface profile for adhesion, repairing cracks, applying a primer or moisture-vapor barrier, installing the epoxy coating, adding decorative flakes if selected, and finishing with a durable UV-resistant topcoat.
  • How long does installation take?

    According to our team, the timeline for decorative concrete in Charlotte, NC depends on the size and condition of the surface, the temperature, and the coating system being used. Projects under 650 square feet typically take one to one and a half days to complete. If same-day completion is necessary, our team can guarantee installation for projects up to 1,200 square feet from start to finish in a single day. Larger projects, such as a standard garage under 4,000 square feet, usually take about three to four days to complete, allowing adequate curing time between coating layers.
  • Can you apply epoxy over cracked or damaged concrete?

    Yes. At Epoxy 704, cracks are repaired and low spots are filled during the preparation stage to create a solid foundation before installing garage flooring in Charlotte, NC.